Digital Radio communication project for Latvian railways August 17, 2020 No Comments The company “Belam”, within consortium “Belam-Belss”, has started to implement the digital radio communication construction project. The project objective is to provide the rolling stock with modern radio communication, thereby providing the Employer with an opportunity to expand the dispatcher-locomotive driver communication functionality, as well as many other functions, the employment of which was impossible Read more
Optical cable design for the needs of Latvian Railways is completed June 17, 2019 No Comments Within the project, Belam-Rīga ensured the design of the new backbone optical data transmission cables. The new optical cables are provided for broadband connection of railway systems in the following directions: Gluda-Reņģe Madona-Gulbene The total length of the designed cable – 104 km. Read more
CONSTRUCTION OF THE RESIDENTIAL ESTATE RIVER BREEZE RESIDENCE October 1, 2018 No Comments A modern residential estate RIVER BREEZE RESIDENCE overlooking Old Riga has been built on the left bank of the river Daugava at 28 Kugu St. The building has 6 floors and 49 apartments, and its total floor space is more than 16,000 m2. The project’s design features the solution involving local telecommunication and security systems Read more
ELECTRIFICATION OF RAILWAY SECTION KOKAND-ANDIZHAN (SCADA SYSTEM) March 9, 2017 No Comments Electrification of railway section Kokand-Andizhan (SCADA system). Successfully completed “Electrification of Railway Section Kokand-Andizhan” project. Project Scope: Remote control system of catenary system and traction substation elements; Electric power accounting system; Video surveillance system on traction substations; Supervision center; Cable networks. Employer: Uzbekistan railways Read more
ELECTRIFICATION OF HIGH-SPEED RAILWAY SECTION SAMARKAND-KARSHI May 4, 2016 No Comments Electrification of high-speed railway section Samarkand-Karshi (telecommunications, SCADA, railway automation systems) Successfully completed “Electrification of High-Speed Railway Section Samarkand-Karshi” project. Project Scope: Installation of telecommunications: Data transmission networks (SDH STM-16/4, Ethernet 10G); Management communication (PABX); Operational communication system; Public address system (PA); Train monitoring system (HABD); Train/Shunting radio communication and public address (Train/Shunting DMR); Supervision Read more
LATVIAN RAILWAY “MODERNIZATION OF SIGNALING SYSTEM ON SHKIROTAVA STATION” December 15, 2015 No Comments Successfully completed “Modernization of Signalling System on Shkirotava Station” project. “Belam-Riga” SIA took part in the project “Modernization of Signalling System on Shkirotava Station”, as a “Bombardier-Belam” Consortium partner under a works and supply contract. The Contract sum was about 42 million euro. Project implementation duration was from 06.2014 to 12.2015. Works performed within the Read more